Innen- und Außengrundierung
Produktbeschreibung
Surface Preparation and Application Method: The surfaces to be applied must be cleaned of any substance that will reduce adhesion. After the primer has dried (4 - 6 hours) top coat paint application is passed. Surface temperature at least 3 degrees above dew point should be high. It is necessary to wait 24 hours between coats in the final coat application. Application Temperature: Min +10°C / Max + 30°C. Thinning / Mixing Ratio: Single component / Water Addition 15 - 20% Paintable (Coated) Area: 5-6 m²/L or 3-4m²/kg (60-80 µ DFT) Drying Time: It dries to the touch in 20-30 minutes and completely dries in 24 hours. Recommended Application Apparatus: It is applied with a roller and brush.
Detailliert

Innen- und Außengrundierung - 66668

richtigstellen Sie die Anwesenheit
Klären Sie Preis 0 0 USD

Minimaler Auftrag: 25 шт

Die Möglichkeit der Lieferung: 25000 шт/pro Monat

Caliskan
nicht überprüfter Lieferant
Mersin, Türkei
Versandinformationen

Berechnen und vervollständigen Sie Ihren Frachttransport mit Qoovee Logistics an jeden Ort der Welt.

Garantierter pünktlicher Versand und sichere Zahlung Qoovee Lieferung

Ähnliche Produkte

Lieferant:
"Узлегпром"
Schreiben Sie uns, wir sind online!