Interior and Exterior Primer Paint
Product description
Surface Preparation and Application Method: The surfaces to be applied must be cleaned of any substance that will reduce adhesion. After the primer has dried (4 - 6 hours) top coat paint application is passed. Surface temperature at least 3 degrees above dew point should be high. It is necessary to wait 24 hours between coats in the final coat application. Application Temperature: Min +10°C / Max + 30°C. Thinning / Mixing Ratio: Single component / Water Addition 15 - 20% Paintable (Coated) Area: 5-6 m²/L or 3-4m²/kg (60-80 µ DFT) Drying Time: It dries to the touch in 20-30 minutes and completely dries in 24 hours. Recommended Application Apparatus: It is applied with a roller and brush.
Learn more

Interior and Exterior Primer Paint - 66668

Check availability
Specify the price 0 0 USD

Minimum order: 25 pcs

Supply ability: 25000 pcs/per month

Stera
Not verified supplier
Mersin, Turkey
Shipping information

Calculate and complete your cargo transportation worldwide using Qoovee Logistics.

Guaranteed shipment on time and secure payment Calculate shipping from Qoovee

Similar products

Suppliers in this category

All suppliers in the category
Contact supplier
Supplier:
"Узлегпром"
Write to us, we are online!